Convert a Line List to Aggregate Counts (Incidence)
Source:R/data-converters.R
enw_linelist_to_incidence.RdThis function takes a line list (i.e. tabular data where each
row represents a case) and aggregates to a count (new_confirm) of cases by
user-specified reference_dates and report_dates. This is enables the use
of enw_preprocess_data() and other epinowcast() preprocessing functions.
Usage
enw_linelist_to_incidence(
linelist,
reference_date = "reference_date",
report_date = "report_date",
by = NULL,
max_delay,
completion_beyond_max_report = FALSE,
copy = TRUE
)Arguments
- linelist
An object coercible to a
data.table(such as adata.frame) where each row represents a case. Must contain at least two date variables or variables that can be coerced to dates.- reference_date
A date or a variable that can be coerced to a date that represents the date of interest for the case. For example, if the
reference_dateis the date of symptom onset then thenew_confirmwill be the number of new cases reported (based onreport_date) on each day that had onset on that day. The default is "reference_date".- report_date
A date or a variable that can be coerced to a date that represents the date the case was reported. The default is "report_date".
- by
A character vector of variables to also aggregate by (i.e. as well as using the
reference_dateandreport_date). If not supplied then the function will aggregate by just thereference_dateandreport_date.- max_delay
The maximum delay (in days) between the
reference_dateand thereport_date. If not supplied then the function will use the maximum observed delay. Note that this function operates before timestep conversion, so max_delay is always in days here. If themax_delayis less than the maximum number of days between thereference_dateand thereport_datein thelinelistthen the function will use this value instead and inform the user.- completion_beyond_max_report
Logical, should entries be completed beyond the maximum date found in the data? Default: FALSE
- copy
Should
obsbe copied (default) or modified in place?
Value
A data.table with the following variables: reference_date,
report_date, new_confirm, confirm, delay, and
any variables specified in by.
See also
Data converters
enw_add_cumulative(),
enw_add_incidence(),
enw_aggregate_cumulative(),
enw_incidence_to_linelist()
Examples
linelist <- data.frame(
onset_date = as.Date(c("2021-01-02", "2021-01-03", "2021-01-02")),
report_date = as.Date(c("2021-01-03", "2021-01-05", "2021-01-04"))
)
enw_linelist_to_incidence(linelist, reference_date = "onset_date")
#> Using the maximum observed delay of 4 days to complete the incidence data.
#> Key: <reference_date, report_date>
#> report_date reference_date new_confirm confirm delay
#> <IDat> <IDat> <int> <int> <int>
#> 1: 2021-01-02 <NA> 0 0 0
#> 2: 2021-01-03 <NA> 0 0 1
#> 3: 2021-01-04 <NA> 0 0 2
#> 4: 2021-01-05 <NA> 0 0 3
#> 5: 2021-01-02 2021-01-02 0 0 0
#> 6: 2021-01-03 2021-01-02 1 1 1
#> 7: 2021-01-04 2021-01-02 1 2 2
#> 8: 2021-01-05 2021-01-02 0 2 3
#> 9: 2021-01-03 2021-01-03 0 0 0
#> 10: 2021-01-04 2021-01-03 0 0 1
#> 11: 2021-01-05 2021-01-03 1 1 2
#> 12: 2021-01-04 2021-01-04 0 0 0
#> 13: 2021-01-05 2021-01-04 0 0 1
#> 14: 2021-01-05 2021-01-05 0 0 0
# Specify a custom maximum delay and allow completion beyond the maximum
# observed delay
enw_linelist_to_incidence(
linelist, reference_date = "onset_date", max_delay = 5,
completion_beyond_max_report = TRUE
)
#> Key: <reference_date, report_date>
#> report_date reference_date new_confirm confirm delay
#> <IDat> <IDat> <int> <int> <int>
#> 1: 2021-01-02 <NA> 0 0 0
#> 2: 2021-01-03 <NA> 0 0 1
#> 3: 2021-01-04 <NA> 0 0 2
#> 4: 2021-01-05 <NA> 0 0 3
#> 5: 2021-01-02 2021-01-02 0 0 0
#> 6: 2021-01-03 2021-01-02 1 1 1
#> 7: 2021-01-04 2021-01-02 1 2 2
#> 8: 2021-01-05 2021-01-02 0 2 3
#> 9: 2021-01-06 2021-01-02 0 2 4
#> 10: 2021-01-07 2021-01-02 0 2 5
#> 11: 2021-01-03 2021-01-03 0 0 0
#> 12: 2021-01-04 2021-01-03 0 0 1
#> 13: 2021-01-05 2021-01-03 1 1 2
#> 14: 2021-01-06 2021-01-03 0 1 3
#> 15: 2021-01-07 2021-01-03 0 1 4
#> 16: 2021-01-08 2021-01-03 0 1 5
#> 17: 2021-01-04 2021-01-04 0 0 0
#> 18: 2021-01-05 2021-01-04 0 0 1
#> 19: 2021-01-06 2021-01-04 0 0 2
#> 20: 2021-01-07 2021-01-04 0 0 3
#> 21: 2021-01-08 2021-01-04 0 0 4
#> 22: 2021-01-09 2021-01-04 0 0 5
#> 23: 2021-01-05 2021-01-05 0 0 0
#> 24: 2021-01-06 2021-01-05 0 0 1
#> 25: 2021-01-07 2021-01-05 0 0 2
#> 26: 2021-01-08 2021-01-05 0 0 3
#> 27: 2021-01-09 2021-01-05 0 0 4
#> 28: 2021-01-10 2021-01-05 0 0 5
#> report_date reference_date new_confirm confirm delay